[DEME] DP3 Orion

Post Reply
User avatar
Dredging360.com
Reply if you dare!
Posts: 324
Joined: Sat Jun 01, 2019 2:08 pm
Contact:

[DEME] DP3 Orion

Post by Dredging360.com »

Image

Image
construction year // 2019

general
type Offshore Heavy Lift DP3 Installation Vessel
classification Det Norske Veritas & Germanischer Lloyd

main dimensions
length 216.50 m
breadth 49.00 m
depth 16.80 m

crane
capacity
3,000 ton at 50 m
5,000 ton at 35 m

power & propulsion
dynamic positioning DP3
propulsion
4 x 4,500 kW Azimuth Thrusters
2 x 4,200 kW Retractable Thrusters
2 x 2,500 kW Tunnel Thrusters
installed power 44,180 kW (Dual Fuel)

operational conditions
pay load (max) 30,000 ton
free deck area 8,000 m²
operating draft (max) 11.00 m

other
accommodation 131 persons (extendable to 239 persons)
helideck installed
moonpools space claim for 19,6 m x 10,5 m
auxiliary crane 2 x 100 ton, knuckle boom, manriding
other 8 points mooring system



User avatar
Dredging360.com
Reply if you dare!
Posts: 324
Joined: Sat Jun 01, 2019 2:08 pm
Contact:

Re: [DEME] DP3 Orion

Post by Dredging360.com »

Image

Image

Image

Image
Another step closer to the delivery of one of our new flagships! ⚓ Next generation DP3 offshore installation vessel ‘Orion’ has left the shipyard for a set of sea trials. These are conducted to measure ‘Orion’s’ performance and to test the dual fuel engines to maximum power. ‘Orion’ will be deployed to construct the largest offshore wind farms, to service the oil & gas industry and to decommission offshore installations. #DEMEGroup #DEMEOffshore #OrionTheOffshoreGiant #Orion #OffshoreWind


User avatar
Dredging360.com
Reply if you dare!
Posts: 324
Joined: Sat Jun 01, 2019 2:08 pm
Contact:

Re: [DEME] DP3 Orion

Post by Dredging360.com »

Image

User avatar
Dredging360.com
Reply if you dare!
Posts: 324
Joined: Sat Jun 01, 2019 2:08 pm
Contact:

Re: [DEME] DP3 Orion

Post by Dredging360.com »

Image

Image

Post Reply

Return to “Others”