construction year 2017
dimensions
length overall 115.80 m
breadth overall 25.00 m
moulded depth 9.00 m
draught maximum 8.25 m
dredging depth
normal / extended 31.00 / 43.00
*deep dredge installation 60.00 m
diameter
suction pipe 1,200 mm
discharge pipe 1,000 mm
hopper capacity
hopper capacity up to max overflow 8,400 m³
maximum speed loaded 14.00 knots
power total installed 11,214 kW
remarks
This hopper can be equipped with the D.R.A.C.U.L.A. system
This hopper has dual fuel engines
[DEME] Scheldt River, 8400m3, 2017
- Dredging360.com
- Reply if you dare!
- Posts: 324
- Joined: Sat Jun 01, 2019 2:08 pm
- Contact:
[DEME] Scheldt River, 8400m3, 2017
- Dredging360.com
- Reply if you dare!
- Posts: 324
- Joined: Sat Jun 01, 2019 2:08 pm
- Contact:
Re: [DEME] Scheldt River, 8400m3, 2017
Titan LNG’s FlexFueler bunkers DEME’s LNG-powered dredger
The service supplier of liquefied natural gas Titan LNG completed the bunkering of DEME’s LNG-powered dredger.
The company said in a brief statement through its social media channels that its liquefied natural gas bunkering barge, the FlexFueler001 bunkered the LNG-powered trailing suction hopper dredger, the Scheldt River.
At the moment, the FlexFueler001, is operated by Amulet Marine Services and serves vessels ranging from tankers, containerships to ro-ro’s.
It is being deployed in the ports of Amsterdam and Rotterdam, while Titan LNG intends to deploy its second LNG bunkering barge, the FlexFueler002 in the port of Antwerp.
The vessel is currently under construction and is expected to be in service by mid-2020. In an earlier statement, Titan LNG said it plans to unveil its third vessel in the coming months.