[Van Der Kamp International Dredging BV] Hein, 3656m3, 1979

Post by Dredging360.com »

Dredge Point: Hein
General properties
IMO number: 7911856
MMSI number: 244061000
Callsign: PEPN
Vessel type: TSHD
Flag: NL
Owner: Van Der Kamp International Dredging BV
Manager: Van Der Kamp International Dredging BV
Built in: 1979
Shipyard: Scheepswerf Ferus Smit BV
Yard number: 222

Physical properties
Length (OA): 107 m
Length (BP): 98.81 m
Width: 15.47 m
Depth: 6.5 m
Draft (loaded): 6 m
Number of engines: 2
Engine specs: 2 x Caterpillar
Speed (loaded): 10 knts
Hopper volume: 3656 m³
Dredging depth: 35 m
Suction pipe diameter: 0.7 m
Number of dredging pipes: 1



User avatar
Dredging360.com
Reply if you dare!
Posts: 324
Joined: Sat Jun 01, 2019 2:08 pm
Contact:

Re: [Van Der Kamp International Dredging BV] Hein, 3656m3, 1979

Post by Dredging360.com »

Damen Shiprepair & Conversion

Image

Image
Van der Kamp dredging of Zwolle’s TSHD 'Hein' is a regular visitor to Damen Shipyards Harlingen. She is currently at the yard to undergo her Class special survey (5-yearly inspection).
Thickness measurements, tank inspections and inspections of machinery and equipment as well as service of safety equipment are part of this survey.
As dredgers like 'Hein' are susceptible to wear, due the erosive influence of dredged substances, for the yard this means that steel replacement is one of the major jobs to be carried out.
The owners at the same time take care of servicing dredging equipment to be able to have the vessel operate in a reliable manner for the upcoming period.
Engines, pumps, piping, valves and boxcoolers are being serviced.
One of the ship’s azimuth thrusters will be replaced with a serviced spare unit.
On the conservation side the decks will be hydrojetted to receive fresh layers of paint and the exterior of the hull will also be grinded, cleaned and painted.
Upon completion of this 3-week work 'Hein' will be ready to go back into service.